Calculation of Weaver’s Load / Calculation of Weaver’s Load: (Class)


* Calculation of weaver’s load
Assume total no. of looms= 50.
Sl no.
Occurance (x)
No. of x/loom/hr y
Time for each repair z (min)
Total time yz
    1.       
Warp break /hr/loom
3
.5
1.5
    2.       
Weft break /hr/loom
2
.4
0.8
    3.       
Trimming /hr/loom.
3
.3
0.9
    4.       
Skewering /hr/loom.
3
.3
0.9
    5.       
Shuttle trap/hr/loom
0.25
1
0.25
    6.       
Patrol /hr/loom.
4
.25
1.00
Total repair time/loom/hr=5.35
No. of looms/ weaver at standard work load=  50/5.35 = 9.34 =9


 * Calculation of weaver’s load: (Class)
Sl no.
Occurance (x)
No. of x /gr/loom
Y
Time for each repair
Z (min)
Total time yz (min)
    1.           
Warp break
1.2
0.80
0.96
    2.           
Weft break
0.3
0.5
0.15
    3.           
Slack ends.
0.1
0.5
0.05
    4.           
Pirn change.
3
0.2
0.06
Total repair time /loom /hr=1.76 mins
Maximum no. of loom which can be assigned to a weaver= 50/1.76 =28
(maximum work load 50 min/hr)
Minimum no. of loom which can be assigned to a weaver= 45/1.76 = 25
[ minimum work load 45 min/hr]

0 comments:

Post a Comment

 
Develop and Design by Textile Students | Viva or Interview